Hydro Power Plant Lighting Projects

We have with us rich industry experience which helps us to carry out turnkey illumination projects for hydro power plants.

Featured Projects

6×170 MW Punatsangchhu Hydroelectric Project (PHPA) – I in Bhutan

6×170 MW Punatsangchhu Hydroelectric Project (PHPA) – II in Bhutan

6 x170 MW TALA, BHUTAN of Tala Hydro Electrical Project Authority, Bhutan

4×180 MW Mangdechhu Hydroelectric Project , Bhutan

2×50 MW Sainj hydroelectric plant of HPPCL

Afghan-India Friendship Dam (Also know as 3x14MW Salma Project, Afghanistan)

6×68.67 MW Rampur of Satluj Jal Vidyut Nigam (SJVN)

3×150 MW BAGLIHAR-I 3×150 MW BAGLIHAR- II of JKPDC

Major Hydro Power Projects :

  • 6×170 MW TALA, BHUTAN of Tala Hydro Electrical Authority

    BHUTAN

  • 3×150 MW BAGLIHAR-I & II of JKPDC through Voith

    Baglihar | Jammu and Kashmir

  • 4×40 MW Teesta IV of NHPC through BHEL

    Teesta IV | West Bengal

  • 6×68.67 MW cof SJVN through BHEL

    Rampur | Uttar Pradesh

  • 6×170 MW PHPA II HEP in Bhutan

    PHPA II  | Bhutan

  • 6×170 MW PHPAI HEP in Bhutan

    PHPAI  | Bhutan

  • 3x14MW Salma, Afghanistan (Only Supply Part) through BHEL

    Afghanistan

  • 2×50 MW Sainz HPPCL through Voith

    Sainj | Himachal Pradesh

  • 4×150 MW Kameng of NEEPCO through BHEL

    Kameng | Arunachal Pradesh

  • 2x30MW Tuirial of NEEPCO through BHEL

    Mizoram

  • 4×180 MW Mangdechhu, Bhutan through BHEL

    Mangdechhu | Bhutan

  • 3×60 MW Bajoli Holi of GMR through Alsthom/GE

    Bajoli | Himachal Pradesh

  • 4×250 MW Pakaldul of Chenab Valley Power Projects through Voith

    Pakaldul | Jammu and Kashmir

  • 4x76MW MANERIBHALI –II of UJVNL

    MANERI BHALI –II | Uttarakhand

  • 2×55 MW Chuzachen of GATI Infrastructure through Althom/GE

    Chuzachen | Sikkim

  • 3×77 MW CHAMERA –III of NHPC through Alstom/GE

    CHAMERA –III | Uttar Pradesh

  • 4x 60 MW URI – II of NHPC through Alstom/GE

    URI – II | Jammu and Kashmir

  • 2×57 MW Dagachu , Bhutan through Alstom/GE

    Dagachu | Bhutan

  • 2x 55 MW Sorang of NCC

    Sorang | Himachal Pradesh

  • 4×40 MW Lower Jurala (Only Supply Part) of APGENCO through Alstom/GE

    Jurala | Telangana

  • 2×48 MW Jorethang HEP of Dens energy through Alstom/GE

    Jorethang | Sikkim

  • 8×250 MW Subhansiri of NHPC through Alstom/GE

    Subansiri | Arunachal Pradesh

  • 2×9 MW Mukerian of PSEB through BHEL

    Mukerian | Punjab

  • 4x 130 MW Tapovan Vishnugad of NTPC through BHEL

    Tapovan Vishnugad | Uttarakhand

  • 3×110 MW Kishanganga of NHPC through BHEL

    Tapovan Vishnugad | Kashmir

  • 2×41 MW Lower Solu of Solu Hydropower through GE

    Tidong of Statkraft | Himachal Pradesh

  • 2×50 MW Tidong of Statkraft through GE

    Tidong of Statkraft | Himachal Pradesh

  • 2×41 MW Lower Solu of Solu Hydropower through GE

    Lower Solu of Solu | Nepal